Single-cantilever steel canopies over the civic centre staff car park, with eight Level 2 chargers wired in while the foundations were open. The city leases the 310 kWp system for a fixed monthly rent, with no capital from its budget.
As-built figures and the first twelve months of revenue-meter data. The fleet share comes from the charger logs, matched to the canopy output every fifteen minutes.

Permits for a canopy take longer than for a roof: building and zoning both sign off. On site, half the car park stayed open every day of the build.




