FLEET STATUS · 338 / 340 sites online · uptime 99.6% (2025)
Mon–Fri 7:00–18:00 CT     Careers     Client Portal
SALES DESK
+1-555-0188
HEAD OFFICE
1180 Meridian Pkwy, Ashford TX
FEASIBILITY
10-day desk study, no fee
Home / Solutions / O&M & Monitoring
DOC NB-P03 · REV. 10/2026
[ Solution S-05 ]

Every string watched,
every alarm answered.

Monitoring, thermal drone surveys and field repairs for every site in the fleet — including systems we did not build. Our own technicians roll to every fault, and you get a report string by string, every month.

< 4 H ON SITE
THERMAL DRONE × 2 / YR
ANY SYSTEM, ANY BUILDER
SOLUTION FILE
S-05 · O&M
99.6%
Fleet uptime in 2025 across every site we monitor — ours or someone else’s.
SITES UNDER O&M
296
FIELD TECHNICIANS
38 on staff
DATA PER SITE
96k points a day
 
ON THIS PAGE
01   Scope
02   Service sheet
03   Service levels
04   Projects & FAQ
01 / Scope

One desk from handover to year 25.

Our Ashford operations centre reads 340+ sites around the clock, every string every fifteen minutes. Alarms go to an analyst, not an inbox, and the technician who rolls to site already has the string map and the last thermal survey on a tablet.

We take over inherited fleets too. The first ninety days are a baseline — a full site audit, a thermal survey and a yield model of our own — so the guarantee we sign rests on our numbers, not someone else’s.

O&M SITES
296
UNDER P50
4
MEDIAN FIX
9DAYS
Operations analyst monitoring solar sites on screens
IR SURVEY · NB-0412 · ROW 14
Hot-spot +18 °C · closed in 3 h 12 min
FIG. 01 — Technician checking string data at an inverter after a thermal alarm
IN SCOPE · STANDARD CONTRACT
10 ITEMS
Live string-level monitoring, 24 / 7
Alarm triage by an analyst
Fault response under 4 h on site
Thermal drone survey every 6 months
Preventive maintenance visits
Module cleaning when soiling bites
Vegetation & roof-walk checks
Monthly report, per string
Annual yield reconciliation
Spare parts held regionally
OPTIONAL · OR BY OTHERS
Takeover audit of an inherited fleet
FIRST 90 DAYS, FIXED FEE
Inverter replacement programme
PRICED PER SITE
Storage controller re-tuning
SEE S-04 · STORAGE
Repowering & module swaps
QUOTED FROM THE AUDIT
02 / Service sheet

The service sheet every O&M contract starts from.

Scope is written line by line and priced per kWp per year, so your finance team knows exactly what the fee buys — and what it does not.

SERVICE SHEET · S-05 STANDARD
REV. E
ITEM
STANDARD
OPTION
MONITORING
String-level, 15-min data, live portal
Revenue-grade meter + weather station
FAULT RESPONSE
< 4 h on site, 24 / 7 / 365
< 2 h for critical sites
THERMAL SURVEY
Drone, every 6 months
Quarterly on large fields
PREVENTIVE VISITS
Twice a year, full checklist
Quarterly
CLEANING
When soiling losses pass 3%
Fixed schedule
REPORTING
Monthly per string · annual reconciliation
ESG export for your auditors
SPARES
Inverters & modules held regionally
On-site spares cabinet
SYSTEMS COVERED
Any make, any builder
Storage & EV chargers
YIELD GUARANTEE
95% of P90, settled in cash yearly
—
Two engineers in hi-vis vests reviewing a drawing on a solar roof
YIELD GUARANTEE
Miss 95% of the P90 yield and we pay the difference — on sites we inherit, too.
101.6%
Fleet yield vs P50, 2025
99.6%
Fleet uptime, 2025
03 / Service levels

Four service levels, one operations centre.

Every level includes the same live monitoring and the same analysts. What changes is how much of the site work, reporting and risk we take on.

O-1

Monitor

Live string data, alarm triage and a monthly report; your contractor does the site work.

RESPONSE
Remote, 24 / 7
VISITS
None included
GUARANTEE
—
OUR SITES
12%
O-2

Maintain

Monitoring plus preventive visits and fault repairs by our own technicians.

RESPONSE
< 4 h on site
VISITS
2 a year
GUARANTEE
—
OUR SITES
21%
O-3

Full O&M

Everything in Maintain, plus drone surveys, cleaning and the yield guarantee.

RESPONSE
< 4 h on site
VISITS
2 a year + drone
GUARANTEE
95% of P90
OUR SITES
58%
O-4

Asset Management

Full O&M plus finance reporting, insurance claims and repowering plans.

RESPONSE
< 4 h on site
VISITS
2 a year + drone
GUARANTEE
95% of P90
OUR SITES
9%
TAKEOVER
90 days to bring an inherited site onto our desk.
01
DAY 1–10
Data link
Loggers, meters and portal moved to our operations centre
02
DAY 11–30
Site audit
Torque, wiring, inverter logs and a full roof or field walk
03
DAY 31–60
Thermal survey
Drone flight, hot-spots logged and ticketed
04
DAY 90
Baseline report
Our own yield model — and the guarantee we will sign
04 / Sites on our desk

Three sites, three performance reports you can check.

Distribution centre roof covered in solar modules above parked trucks

Harbor Logistics

Rooftop + storage · 1,742 MWh/yr · grid spend −31%
1.2 MWp
Technician flying an inspection drone over a rooftop solar array

Orbis Medical Campus

Rooftop + 2 MWh storage · 6 buildings
2.1 MWp
Agricultural building with a rooftop solar array among fields

Marlow Orchard Barn

Rooftop · standing seam · 104.0% of P50
96 kWp
05 / FAQ

O&M questions asset owners ask first.

Short answers here; the long ones are in the service sheet and your first monthly report.

Portrait of Elena Vasquez
Ask Elena’s team
O&M & operations desk
PHONE
O&M DESK
24 / 7 / 365

Will you maintain a system you did not build?

Yes — about a fifth of the sites on our desk were built by someone else. We start with a ninety-day takeover: data link, full audit and thermal survey, then a baseline yield model we are prepared to guarantee.

How fast do you respond to a fault?

An analyst sees every alarm within minutes, and our contract SLA puts a technician on site in under four hours, around the clock. Most faults close on the first visit because the van carries the common spares.

What does the monthly report show?

Yield against P50 and P90, availability, every alarm and how it was closed, and losses split by cause — soiling, shading, faults, grid and planned work — so you can see which were ours to fix.

Why fly thermal drone surveys?

A hot cell or a loose connector can cost a whole string for months before it shows in the data. A survey twice a year finds them early; on one 1.2 MWp roof the ticket went from alarm to closed in just over three hours.

What happens if a site runs below P50?

We say so. Each site below P50 gets a root-cause note and a fix plan; in 2025 four of our 296 sites ran under P50 and the median fix took nine days. If yield falls below 95% of P90, we pay the difference in cash.

How long are your O&M contracts?

From one year for inherited fleets up to 25 years, the life of the yield guarantee. The fee is fixed per kWp per year, with the scope written line by line in the service sheet.

Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY
DIRECT LINES
SALES DESK
+1-555-0188
O&M DESK
24 / 7 / 365