Monitoring, thermal drone surveys and field repairs for every site in the fleet — including systems we did not build. Our own technicians roll to every fault, and you get a report string by string, every month.
Our Ashford operations centre reads 340+ sites around the clock, every string every fifteen minutes. Alarms go to an analyst, not an inbox, and the technician who rolls to site already has the string map and the last thermal survey on a tablet.
We take over inherited fleets too. The first ninety days are a baseline — a full site audit, a thermal survey and a yield model of our own — so the guarantee we sign rests on our numbers, not someone else’s.

Scope is written line by line and priced per kWp per year, so your finance team knows exactly what the fee buys — and what it does not.

Every level includes the same live monitoring and the same analysts. What changes is how much of the site work, reporting and risk we take on.
Live string data, alarm triage and a monthly report; your contractor does the site work.
Monitoring plus preventive visits and fault repairs by our own technicians.
Everything in Maintain, plus drone surveys, cleaning and the yield guarantee.
Full O&M plus finance reporting, insurance claims and repowering plans.



Short answers here; the long ones are in the service sheet and your first monthly report.
Yes — about a fifth of the sites on our desk were built by someone else. We start with a ninety-day takeover: data link, full audit and thermal survey, then a baseline yield model we are prepared to guarantee.
An analyst sees every alarm within minutes, and our contract SLA puts a technician on site in under four hours, around the clock. Most faults close on the first visit because the van carries the common spares.
Yield against P50 and P90, availability, every alarm and how it was closed, and losses split by cause — soiling, shading, faults, grid and planned work — so you can see which were ours to fix.
A hot cell or a loose connector can cost a whole string for months before it shows in the data. A survey twice a year finds them early; on one 1.2 MWp roof the ticket went from alarm to closed in just over three hours.
We say so. Each site below P50 gets a root-cause note and a fix plan; in 2025 four of our 296 sites ran under P50 and the median fix took nine days. If yield falls below 95% of P90, we pay the difference in cash.
From one year for inherited fleets up to 25 years, the life of the yield guarantee. The fee is fixed per kWp per year, with the scope written line by line in the service sheet.