A 64-building campus heat network moving from steam to low-temperature hot water, phased over six summers so no term is disrupted. Eleven incentive programmes paid for a fifth of it.
Every figure comes from the roadmap, the incentive awards or the M&V reports. Savings are measured on the buildings converted so far.

Monthly campus energy in the baseline year and the most recent measured year — the heating months show the steam losses that are gone.





Each summer converts one group of buildings between Commencement and the start of term; M&V measures each phase before the next is released.