4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects
FILE WW-P12 · REV. 10/2026
[ Project register ]

Eight ridges.
Every one on the record.

Four farms turning, one being built and three moving through studies and permits. Each card lists the turbines, the community share and what the local fund pays — the same facts, every site.

453 MW PIPELINE
3 COUNTIES
20% COMMUNITY-OWNED
PROJECT FILE
WW-PR · 2026
201MW OPERATING
Four farms and a battery yard, built and run by Westerly since 2016 across Larch and Owen counties.
FARMS OPERATING
4 + battery yard
IN BUILD
Hartfell Edge · 84 MW
SHAREHOLDERS
2,340
 
ON THIS PAGE
01   Operating
02   Hartfell Edge
03   Pipeline
04   Map & fleet data
01 / Operating

Four farms turning, and the battery yard beside the first.

Every operating site pays into its local fund from the first megawatt-hour and gives neighbours within two miles a $320 bill discount.

OPERATING5
ORDERED BY SITE CODE · WW-01 → WW-04
Wind turbines on a misty green ridge at sunrise, with a battery yard beside the access road

Calder Ridge

12 × 4.0 MW · operating since 2016 · battery yard 2024
48 MW
A line of wind turbines along a grassy ridge at golden hour

Pell Moor

15 × 4.2 MW · operating since 2019 · $412k fund in 2025
63 MW
Wind turbines on a snow-dusted hill above a dry stone wall

Whinfell

9 × 4.0 MW · operating since 2021 · highest site at 610 m
36 MW
Aerial view of wind turbines across green farmland with an access track

Bracken Rise

13 × 4.2 MW · operating since 2023 · built on working farmland
54 MW
Wind farm substation and battery containers behind a palisade fence

Calder Ridge Battery Yard

20 MW / 40 MWh beside our oldest farm · 99.1% available
40 MWh
03 / Pipeline

Four more ridges, each at its own stage.

From a wind mast on Tamsin Flats to cranes on Hartfell Edge. Every pipeline site has drop-in days before anything is drawn, and a share offer before anything is built.

BUILDING1
PERMITTED1
PLANNING1
SCOPING1
Construction crew beside a freshly poured wind turbine foundation

Hartfell Edge

20 × 4.2 MW · first power Q3 2027 · 20% community-owned
84 MW
Upland farmland with a wind farm on the ridge

Ashby Downs

14 × 4.0 MW · permit granted 2026 · share offer 2028
56 MW
Restored wildflower meadow with grazing cattle and wind turbines behind

Norrow Hill

18 × 4.0 MW · application filed · drop-in 8 Nov
72 MW
Wind measurement mast on open moorland with a parked four-by-four

Tamsin Flats

Up to 10 turbines · wind mast up · first drop-in 2027
40 MW
04 / Map view

Three counties, one ridge line.

Every site sits on the same upland ridge west of Larch Valley, within an hour of the O&M base at Calder Ridge — so a technician can reach any turbine on the same shift.

Map2
LARCH · OWEN · SABLE COUNTIES
N
10 mi
WW-01 Calder Ridge
WW-02 Pell Moor
WW-03 Whinfell
WW-04 Bracken Rise
WW-05 Hartfell Edge
WW-06 Ashby Downs
WW-07 Norrow Hill
WW-08 Tamsin Flats
WW-01
WW-02
WW-03
WW-04
WW-05
WW-06
WW-07
WW-08
SITES BY COUNTY
OCT 2026
COUNTY
SITES
CAPACITY
Larch County
Calder Ridge · Pell Moor · Norrow Hill
3
183 MW
Owen County
Whinfell · Bracken Rise · Tamsin Flats
3
130 MW
Sable County
Hartfell Edge · Ashby Downs
2
140 MW
Battery yard
Calder Ridge · 20 MW / 40 MWh
+1
40 MWh
Total
8
453 MW
05 / Fleet data

Forecast output, delivered output.

P50 is the output we expect in an average wind year. We publish the gap for every farm, including the years the wind didn’t blow.

201MW
OPERATING TODAY
618GWh
GENERATED IN 2025
99.1%
BATTERY YARD AVAILABILITY
$6.3M
LOCAL FUND PAID SINCE 2016
OUTPUT VS P50 BY FARM · 2025
SCALE 90–110% · LINE = P50
Whinfell
 
 
 
 
105.2%
Pell Moor
 
 
 
 
104.0%
Bracken Rise
 
 
 
 
101.5%
Calder Ridge
 
 
 
 
99.4%
90%
P50
110%
Metered at the substation export meter and corrected for the year’s wind. P50 = the output we expect in an average wind year.

Below forecast? We say so — and why.

One farm ran under P50 in 2025: Calder Ridge lost five weeks on T9 to a gearbox exchange. Bracken Rise stayed above forecast despite stopping at dusk through the spring bat season. Both notes are published.

FARMS UNDER P50
1 of 4
TURBINE AVAILABILITY
97.8%
MONITORING
10-min SCADA, 24 / 7
Next step / Live near a site?

Ask about the farm on your ridge — or buy a share in the next one.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS